Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46273 REL 119: 2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION - PROJ DESIGN
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
46273 REL 119
Contract Title:
2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION - PROJ DESIGN
Contract Continuation:
Previous: Next:
46273 REL 104: 2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION - PROJ DESIGN
  • 46273 REL 134: 2003-017-00 EXP ISEMP NOAA FISHERIES COORDINATION - PROJ DESIGN
Contract Status:
Closed
Contract Description:
FY-2016 Contract Description:

This contract's specific portion of the entire project (2003-017-00 and 2011-006-00) addresses overall coordination tasks.  The overall technical and scientific coordination of the project is accomplished by the project sponsor (NMFS/NWFSC, Dr. Chris Jordan) through this contract.  Specifically, the FY2016 instance of this contract will involve the following tasks.

A - C 162 ISEMP Data Analysis - , produce restoration based scenarios for individual based and population based watershed life cycle models, and finalize a watershed classification system for the Columbia River basin.

D 156 PIT tag instream antenna design and installation - Design, build, install and maintain in-stream PIT tag antenna infrastructure for ISEMP projects in the John Day, Wenatchee/Entiat and Salmon River basins as needed due to annual maintenance demands and period equipment failure due to multiple causes.

E 029 Install and maintain Beaver Dam Analogs (BDAs) - Install FY16 component of Beaver Dam Analog structures consisting of repairing previous years' component of Beaver Dam Support structures as described in the BCRMP Biological Opinion and support the design and implementation of Beaver Dam Analog based restoration in watersheds of the Columbia River Basin.

F 189 Coordinate ISEMP and CHaMP into regional RME processes - Participation in regional RME planning processes to integrate ISEMP/CHaMP data, lessons learned, and analyses into ongoing or emerging RME or tributary habitat management decision making processes.

G 174 Annual Analysis Work Plan - Through regular meetings, weekly coordination calls, and analysis workshops, develop an annual analysis workplan for ISEMP/CHaMP analysis team based on progress to date on current analysis tasks, input from BPA, NPCC and NOAA staff regarding FWP and FCRPS BA and BO needs.  

H 119 Manage and Administer Projects - Develop an annual analysis work plan for ISEMP-CHaMP and provide copies of financial and administrative documents throughout the length of contract and as required by BPA. Coordinate and attend conference calls and meetings to communicate project status and needs with BPA COTR.

I 156 Environmental Compliance - Provide necessary supporting documentation and assistance to BPA's Environmental Compliance Group (such as maps, design drawings, survey reports, permit applications, ESA documents, etc.) to assure a timely receipt of EC compliance letter.  Provide copies of fully executed ESA sampling permits for fish work under ISEMP.

J 185 Produce Periodic Status Reports - Pisces based reports on the status of milestones and deliverables.  Reports shall be completed either monthly or quarterly as determined by the BPA COTR.  

K 202 BiOp RPA Report for CHaMP CY 2015 - Develop material for inclusion in annual RPA report.  Provide to Terraqua (CR 293052) for technical editing that final report assembly and delivery.

L 132 Produce CY2016 Integrated RME Technical Report for ISEMP/CHaMP - Develop material for inclusion in Integrated ISEMP/CHaMP technical report, provide to Terraqua (CR 293052) for technical editing and final report assembly and delivery.


The role of actions under this contract are to integrate and oversee all other ISEMP (2003-017) contract and cost-share actions.  As a result, some WEs appear redundant with other contracts; however, these are shared tasks and tasks where direct NOAA staff or contractor participation is necessary.  All potential WE overlap is identified in the WE description.

*******
Background:

The Integrated Status and Effectiveness Monitoring Program (ISEMP, 2003-017-00) is an ongoing collaborative effort to design, test, implement and evaluate Status and Trends Monitoring for salmon and steelhead populations and their habitat, and watershed-scale Effectiveness Monitoring for management actions impacting salmon and steelhead populations and habitat in the Interior Columbia River Basin.

ISEMP explicitly addresses work requirements of many 2008 FCRPS Biological Opinion RPAs (56.1, 56.2, 56.3, 57.1, 57.2, 57.3, 57.4, 57.5) and is directly related to additional 2008 FCRPS Biological Opinion implementation strategy requirements and recommendations. ISEMP takes a pilot-project approach to the research and development of monitoring by implementing experimental programs in several major subbasins of the Interior Columbia: the Wenatchee, Entiat, Methow, John Day, South Fork Salmon and Lemhi River basins. The overall goal of the project is to provide regional salmon management agencies with the data, information and tools necessary to design efficient and effective monitoring programs.

Specifically, ISEMP generates quantitative guidance on and examples of: the robustness and limitations of population and habitat monitoring protocols, indicators and metrics; sampling design approaches for the distribution of monitoring effort in time and space; analytical approaches to the evaluation of monitoring data, information and programs; effective data management and communication designs that support the use, standardization and compilation of implementation, compliance, status, trends and effectiveness monitoring data by regional data generators and decision makers; and finally the design and implementation of watershed-scale restoration actions to maximize both the biological impact and associated learning opportunities resulting from the design and implementation strategy.

Through its work to date, ISEMP has developed expertise in the coordination and implementation of large-scale monitoring data collection programs. Applying this experience, ISEMP coordinates the installation, maintenance and calibration of in-stream PIT tag arrays across the Snake River basin and is designing and coordinating the implementation of a Columbia River basin-wide stream habitat status and trends monitoring. These programmatic implementation facets of ISEMP leverage previous experience with logistics and social factors to effectively implement comprehensive, standardized monitoring research and development at an unprecedented scale.  

**********
Note regarding property inventory - items carried over from previous contracts.

Prior Contract 35962 -- NOAA-Fisheries

Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7100  Acquisition Date 2/1/09  Cost: $8,500 POC: Chris Jordan 541.754.4629
Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7101  Acquisition Date 2/1/09  Cost: $8,500 POC: Chris Jordan 541.754.4629

Prior Contract 41715 -- NOAA-Fisheries

Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7188  Acquisition Date 3/10/10  Cost: $8,500 POC: Chris Jordan 541.754.4629
Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7189  Acquisition Date 3/10/10  Cost: $8,500 POC: Chris Jordan 541.754.4629
Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7190  Acquisition Date 3/10/10  Cost: $8,500 POC: Chris Jordan 541.754.4629
Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7194  Acquisition Date 3/10/10  Cost: $8,500 POC: Chris Jordan 541.754.4629
Digital Angel FS1001M Multiplexing PIT tag transceiver  S/N 7195  Acquisition Date 3/10/10  Cost: $8,500 POC: Chris Jordan 541.754.4629

Prior Contract 46273 Rel 8 -- NOAA-Fisheries

Global Thermoelectric 5060 Peltier Generator S/N 5060-7313-S1K  Acquisition Date 10/1/10  Cost: $6,540 POC: Chris Jordan 541.754.4629

Prior Contract 46273 Rel 28 -- NOAA-Fisheries

Global Thermoelectric 5060 Peltier Generator S/N 5060-  Acquisition Date 6/30/12  Cost: $6,785 POC: Chris Jordan 541.754.4629
Global Thermoelectric 5060 Peltier Generator S/N 5060-  Acquisition Date 6/30/12  Cost: $6,785 POC: Chris Jordan 541.754.4629
Account Type(s):
Expense
Contract Start Date:
07/01/2016
Contract End Date:
06/30/2017
Current Contract Value:
$175,869
Expenditures:
$175,869

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
ISEMP Individual Based Life Cycle Model Restoration Scenarios A: 162. ISEMP - Individual Based Life Cycle Model for restoration scenarios in John Day River basin 06/30/2017 06/30/2017
ISEMP Population Life Cycle Model Restoration Scenarios in the Wenatchee River B: 162. ISEMP - Population Life Cycle Model for Chinook in the Wenatchee River basin 06/30/2017 06/30/2017
Watershed classification system for the Columbia River basin. C: 183. ISEMP - Watershed classification system for the Columbia River basin 06/30/2017 06/30/2017
Operational suite of instream PIT tag antennas across ISEMP IMW watersheds D: 70. Instream PIT tag antenna design, installation and maintenance 06/30/2017 06/30/2017
In-water work -- Beaver Dam Analogs E: 29. Install and maintain Beaver Dam Analogs (BDAs) 06/30/2017 06/30/2017
Regional RME support F: 189. Coordinate ISEMP and CHaMP into regional RME processes 06/30/2017 06/30/2017
Annual analysis workplan for ISEMP and CHaMP G: 174. Annual analysis workplan for ISEMP and CHaMP 12/31/2016 12/31/2016
All administrative tasks fulfilled with timely quality products H: 119. Manage and Administer Projects 06/30/2017 03/30/2017
Environmental Compliance supporting documentation I: 165. Environmental Compliance 06/30/2017 06/30/2017
Submit BiOp RPA Report in Taurus K: 202. BiOp RPA Report for ISEMP-CHaMP CY 2016 03/15/2017 03/15/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 183 Produce Journal Article
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 183 Produce Journal Article
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 162 ISEMP - Individual Based Life Cycle Model for restoration scenarios in John Day River basin 07/01/2016
B 162 ISEMP - Population Life Cycle Model for Chinook in the Wenatchee River basin 07/01/2016
C 183 ISEMP - Watershed classification system for the Columbia River basin 07/01/2016
D 70 Instream PIT tag antenna design, installation and maintenance 08/23/2017
E 29 Install and maintain Beaver Dam Analogs (BDAs) 08/23/2017
F 189 Coordinate ISEMP and CHaMP into regional RME processes 07/01/2016
G 174 Annual analysis workplan for ISEMP and CHaMP 07/01/2016
H 119 Manage and Administer Projects 07/01/2016
I 165 Environmental Compliance 07/01/2016
J 185 Periodic Status Reports for BPA 07/01/2016
K 202 BiOp RPA Report for ISEMP-CHaMP CY 2016
L 132 Produce CY2016 Integrated RME Technical Report for ISEMP/CHaMP 07/01/2016